Journal:JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION
Key Words:Scheduling total load makespan NP-hard FPTAS
Abstract:This paper investigates multi-machine scheduling problems with interval constrained actual processing times. The actual processing time of each job is assumed to be restricted in a given interval otherwise the extra earliness or tardiness time should be used to patch up the flaw of job. The objectives are to find the optimal job sequence to minimize the total load of machines, the number of exceeding-interval jobs and the makespan of job schedule, respectively. This paper shows that both of the total load minimization problem and the exceeding job number minimization problem are polynomially solvable. For the makespan minimization problem, this paper proves that it is NP-hard, and proposes a fully polynomial time approximation scheme (FPTAS) for the case with two parallel machines.
ISSN No.:1547-5816
Translation or Not:no
Date of Publication:2018-04-01
Co-author:Yang, Dar-Li,Zhou Dequn,zp
Correspondence Author:Yu Xianyu
Professor
Main positions:经济与管理学院管理科学与工程系教师
Other Post:中国能源资源系统工程学会理事(2017-);中国智能仿真优化与调度委员会委员(2018-)
Gender:Male
Education Level:东南大学
Degree:博士
Discipline:管理科学与工程
Business Address:812
Contact Information:xyyu@nuaa.edu.cn
Open time:..
The Last Update Time:..