余红发

教授

博士生导师    
硕士生导师
电子邮箱:
联系方式:yuhongfa@nuaa.edu.cn
学科:
土木工程
交通运输工程
土木水利
交通运输

查看更多>

Initial cracking time of magnesium oxychloride cement reinforced concrete based on time-varying model of reinforcement corrosion

发布时间:2018-11-13 点击次数:

所属单位:航空学院

发表刊物:Dongnan Daxue Xuebao

摘要:Aiming at the problem of high chloride content in magnesium oxychloride cement concrete, a time-varying model for the corrosion rate of steel in magnesium oxychloride cement concrete was studied by an electrochemical test. Combined with the corrosion current density and the theoretical model, the initial corrosion time of steel in magnesium oxychloride cement concrete and the cracking time of concrete were predicted. The results show that the corrosion rate of exposed steel (S1) is in agreement with the power function time-varying model: the corrosion rates of BNC® coated steel (S2), Zintek coated steel (S3), Dacromet coated steel (S4) and Geomet coated steel (S5) are all in line with the logarithmic time-varying model, and corrosion rate of Magni coated steel (S6)accords with exponential time-varying model. It is feasible to use the limit of the corrosion current density of steel as a standard for calculating the initial corrosion time of rebar in magnesium chloride cement concrete. S1, S2, S4 and S6 were corroded at the beginning of the test, and the initial corrosion time of S3 is 1 115 d and the initial corrosion time of S5 is 2 760 d. Compared with S1, the cracking time of S2, S3, S4, S5 and S6 is delayed by 345, 2 127, 192, 3 745 and 1 877 d, respectively. The feasibility, the long-term stability and the effectiveness of the coated steel bar in the magnesium oxychloride cement concrete are verified. © 2018, Editorial Department of Journal of Southeast University. All right reserved.

ISSN号:1001-0505

是否译文:

发表时间:2018-05-20

合写作者:Gong, Wei,Qiao, Hongxia,麻海燕,Chen, Guangfeng

第一作者:余红发

通讯作者:Gong, Wei,余红发

版权所有©2018- 南京航空航天大学·信息化处(信息化技术中心)

访问人数: | 开通时间:--

最近更新时间:--