Affiliation of Author(s):经济与管理学院
Journal:PROCEEDINGS OF 2017 IEEE INTERNATIONAL CONFERENCE ON GREY SYSTEMS AND INTELLIGENT SERVICES (GSIS)
Key Words:Project scheduling Grey number Grey linear space
Abstract:Based on the idea of grey theory, the uncertain duration with clear extension but unclear intension in project scheduling can be characterized as the grey number. However, the operations of the grey number borrowed from other uncertainty theory had long puzzled scholars. This paper address grey project scheduling based on grey linear space. The grey linear operation based on grey linear space and comparison method based on the information background were proposed. Then grey project scheduling problem was studied. And the critical path method under grey linear space was developed. Finally, a numerical case was adopted to test effectiveness of proposed method. Results show grey project scheduling and grey critical path method could be established under grey linear space.
Translation or Not:no
Date of Publication:2017-01-01
Co-author:Chen, Nanlei,Su, Bentao
Correspondence Author:Chen, Nanlei,Naiming Xie
Professor
Supervisor of Doctorate Candidates
Gender:Male
Alma Mater:Nanjing University of Aeronautics and Astronautics
Education Level:南京航空航天大学
Degree:212
School/Department:College of Economics and Management
Discipline:Other specialties in Management Science and Engineering
Business Address:Room 607, CEM building
Contact Information:025-84893274
Open time:..
The Last Update Time:..