陈明和

Professor  

Education Level:南京航空航天大学

Degree:Doctoral Degree in Engineering

School/Department:College of Mechanical and Electrical Engineering

Discipline:Aeronautical and Astronautical Manufacturing Engineering. Material Process Engineering

E-Mail:


Paper Publications

Multi-Agent Job Shop Scheduling Strategy Based on Pheromone

Hits:

Affiliation of Author(s):机电学院

Journal:Zhongguo Jixie Gongcheng

Abstract:Aiming at the disadvantages of traditional multi-Agent methods based on contractual network protocol,such as single target optimization,large communication volumes,and poor global performance optimization,a multi-Agent dynamic scheduling strategy was proposed based on pheromone.The strategy achieved indirect negotiation between Agents by pheromone,reduced traffic and realied global multi-objective optimization.In addition,the task allocation stages and buffer job selection stages were optimized at the same time.The independent setup time was taken into account,which was more practical and further improved the overall system optimization effectiveness.Finally,an example simulation was used to verifiy the efficiency of the strategy. © 2018, China Mechanical Engineering Magazine Office. All right reserved.

ISSN No.:1004-132X

Translation or Not:no

Date of Publication:2018-11-25

Co-author:Zhu Haihua,Zhang, Zequn,Jin, Yongqiao,Wang, Yingcong,tdb

Correspondence Author:cmh

Pre One:基于遗传优化算法的微通道紫铜热交换器扩散连接工艺

Next One:Oblique Bending Control of Four Roll Bending for Profile of 2099-T83 Al-Li Alloy